DIAM. Length Rock Type TBM Type Rock Support Year Country Owner
87 SCILLA ITALY - CABLE TUNNEL FOR HIGH VOLTAGE POWER CABLE PASSAGE
  4,1 2,8 Schist, Gneiss and Paragneiss ITALY
86 CONSTRUCTION OF TURIN AUTOMATIC UNDERGROUND, LINE 1, LINGOTTO-BENGASI SECTI
  8,03 1,7 River deposit , sand TBM EPB PRECAST CONCRETE SEGMENTS 2012 ITALY INFRATRASPORTI .TO. S.r.l
85 YINHONGJISHI WATER DIVERSION PROJECT, SHAANXI PROVINCE - PEOPLE’S REP. OF CHINA
  3,755 5,1 marble, chloritic, quarzit TBM DSU CONTRETE SEGMENTS 2011 CHINA SHAANXI PROVINCIAL DEPARTMENT OF WATER
82 HEADRACE TUNNEL OF EL ALTO HYDROPOWER PLANT (PANAMA)
  6,79 3,24 LAHAR EPB PRECAST CONCRETE SEGMENTS 2010 PANAMA HYDRO CAISAN S.A.
79 PANAMA -HEADRACE TUNNELS OF THE HYDROELECTRIC PROJECTS PANDO & MONTE LIRIO
  3,72 13039 Lahar EPB (2) precast concrete segments 2010 PANAMA ELECTRON
78 TURKEY - SURUC WATER TUNNEL
  7,8 17,2 Limestone, marl rocks TBM DOUBLE SHIELD Precast concrete segments 2010 TURKEY ILCI
69 TUNEL LOS BRONCES - CHILE
  4,5 7,65 Monzonite quartz, tourmalinic breccia " Andesite, porphyry " Monzonite quartz, TBM Double Shiel Compact + Back up 1st phase lining by fixing of bolts and metallic panels 2008 CHILE DRAGADOS-BESALCO S.A.
67 TSUEN WAN DRAINAGE TUNNEL
  7,27 5,1 Volcanic tuffs and granodiorites Double Shield Universal TBM Tunnel lining by precast concrete segments, 25 cm thick 2008 Hong Kong Drainage Services Department,
64 CREVOLA TOCE III - NEW HEADRACE TUNNEL
  4,2 9154 Gneiss, mica schists, marbles and lime schists, dolomitic segments Double Shield TBM Compact Tunnel lining with steel ribs 2008 ITALY ENEL SPA
63 BRENNER BASIS TUNNEL BBT SE - Munich-Verona Railway Lilne
  6,3 10,15 granites, granodiorites TBM DOUBLE SHIELD Precast concrete segments 2008 ITALY BBT
62 Completion of Crescenza Sewer Collector , 1st Functional LOT
  3 2500 Fluvial deposit and fault debris 2007-2009 ITALY Comune di Roma, Dipartimento XII
55 PASSIRIO HYDROELECTRIC PLANT
  3,7 5885 DOUBLE SHIELD PRECAST SEGMENT 2006 ITALY ENERPASS AG
53 TALAVE-CENAIO TUNNEL - SPAIN
  4,04 7,5 Sandstone, mudstone DOUBLE SHIELD Thick hexagonal precast concrete segments 2006 SPAIN DRAGADOS SA
52 THESSALONIKI METRO
  6,19 9,6 Clay,sandy clay, sand EPB GREECE
42 COMPLETION OF THE MAIN SEWER COLLECTOR OF ROME NORTH-WEST - ITALY
  3 1250 Fluvial deposit and fault debris 2002-2006 ITALY ACEA SPA
36 LA JOYA HYDROELECTRIC PROJECT - COSTA RICA
  6,18 7850 Lahar, andesitis and tuff Double Shield Precast segment 2003-2005 Costarica Union Fenosa International SA
35 RAILWAY LINE LAMEZIA TERME-CATANZARO LIDO, SECTION SETTINGIANO-CATANZARO LIDO -
  8,7 2362 Clay, marl EPB monoshield Precast segment 2005-2007 ITALY ITALFERR SPA
33 BARCIS HYDROELECTRIC PLANT - ITALY
  0 0 Limestone 1996-1999 ITALY ENEL Hydro SPA
31 TEMPI TUNNEL - ATHENS - SALONICA - GREECE
  0 4000 Calcareous Drill & blast NATM 1995-2001 GREECE Hellenic Railway
29 LHC LARGE HADRON COLLIDER CIVIL ENGINEERING CONSTRUCTION PACKAGE 2
  1525 70 Glacial moraine, molasse 1998-2005 Switzerland CERN - Ginevra
28 PLAVE II & DOBLAR II HYDROELECTRIC PLANTS
  6,98 6000 Limestone Double Shield Precast segment 1998-2000 Slovenia SENG-Soske Elektrarne Nova Gorica
22 SIU HO WAN-SILVERMINE BAY AQUEDUCT
  3,5 7000 Granite, tuff Double Shield NATM 1994-1996 Hong Kong Government of Hong Kong
20 MENTA DIVERSION PROJECT
  4,88 7080 Gneis Double Shield Precast segment 2000-2001 ITALY Regione Calabria
18 CONSORTIUM CLEUSON DIXENCE HYDROPOWER PLANTS LOT "C" & LOT "D"
  5,81 10600 Mica schist, limdestone, claystone Double Shield + EPB Precast segment 1993-1998 Switzerland EOS
17 GENERAL MAIN OF YELLOW RIVER DIVERSION PROJECT
  6,12 21000 Limestone, dolomite, Loess Double Shield Precast segment 1993-1995 CHINA Shanxi Province
16 STRATEGIC SEWAGE DISPOSAL SCHEME - STAGE I
  3,2 4500 Granite Open NATM 1998-2000 Hong Kong Government of Hong Kong
15 UMIRAY-ANGAT TRANSBASIN PROJECT (UATP)
  4,88 13000 Conglomerate, basalt Double Shield Precast segment 1996-2000 Philippines Metrop.Waterworks Sewerage Syst.
12 AUCKLAND CBD REINFORCEMENT PROJECT
  3,56 6450 Sandstone, siltstone Double Shield Precast lining 1997-2000 New Zealand Mercury Energy LTD
9 EVINOS WATER PROJECT - EVINOS-MORNOS TUNNEL & AGIOS DEMITRIOS DAM
  4,04 9700 Shale, sandstone, limestone Double Shield Precast segments 1993-1994 GREECE Ministry of Public Works
8 ATTIKO METRO - EXTENSION ETHNIKI AMYNA-STAVROS GREECE
  9,44 3340 Silts-clay, athens schist EPB monoshield Precast segment 2001-2003 GREECE Attiko Metro SA
7 TREVISO - CALALZO RAILWAY
  8,03 2710 Limestone EPB monoshield Precast segment 2000-2002 ITALY Ferrovie dello Stato SpA
6 NUOVO CANALE VIOLA TUNNEL
  3,7 19000 Phillades Double Shield Precast segment 2001-2003 ITALY AEM - Milano
5 MONTE GIGLIO TUNNEL - ITALY
  4,88 8509 Sandston, marl & limestone Double Shield Precast segment 2003-2005 ITALY ITALCEMENTI SPA
4 TURIN AUTOMATIC SUBWAY : PRINCIPI D'ACAJA STATION - PORTA NUOVA STATION- LOT 5
  8,03 2543 Cemented sand and gravel deposit EPB monoshield Precast segment 2002-2004 Italy SATTI SPA
3 TURIN AUTOMATIC SUBWAY EXTENSION COLLEGNO-PORTA NUOVA - LOT 4
  7,77 2358 Cemented sand and gravel deposit EPB monoshield Precast segment 2002-2004 Italy SATTI SPA
1 TUNNEL OF ABDALAJIS EAST - HIGH SPEED RAIL WAY PROJECT: CORDOBA/MALAGA
  10 7000 Limestone, Sandstone Double Shield Precast Segment 2002-2005 SPAIN GIF



S.E.L.I. SPA - Piazza G. Marconi 26/C - 00144 ROMA - Italy
Tel: +39 06 5929241 - Fax: +39 06 5926220 selispa@selitunnel.com
P.IVA 00857631006