TURKEY - SURUC WATER TUNNEL
Client ILCI INSAAT SANAYI VE TICARET AS
Contract Signed 1st April 2009
Contract amount 17.572.679,32
Start 08/2010
Completion 12/2012
riga
Works performed by SELI SPA
Composed by


MAJOR WORKS
- Service contract for supply of equipment and excavation of a hydraulic tunnel of 17,2 Km by Double Shied TBM, excavation diameter 7,80 m and lining with preacst concrete segments

- Contract provides supply of TBM and auxiliary equipment, supply of materials, spare parts and cutters, including technical assistance for TBM assembly and erection including start-up of excavation works.

CONSTRUCTION METHODS AND EQUIPMENT

Tunnel Excavation

Technical specifications of the Double Shield TBM Mod. DS-0780.131 are:

- boring diameter                            7,80 m
- cutters                                             17"
- max cutterhead thrust                 8.544 kN
- cutterhead speed                        0-7,5 rpm
- cutterhead drive power             2.205 kW (n. 7x315 kW)                                                    
Tunnel Lining

Precast concrete segments (30 cm thickness)

GEOLOGY
Limestone, marl rocks

 
 