STRATEGIC SEWAGE DISPOSAL SCHEME - STAGE I
Client Drainage Services Department, Hong Kong
Contract DC/96/17
Contract amount € 107.440.262,67
Start 02/1998
Completion 06/2001
riga
Works performed by PAUL Y - SELI Joint Venture made of/composta da:
Composed by PAUL Y Construction Co. Ltd
SELI SpA                                    
51%
49%


MAJOR WORKS
Two tunnels for a total length of 9,5 km :
  • Tunnel C from Tseung Kwan O to Kwun Tong, 5.3 km long, 4.23 m diameter, which links the shafts previously excavated by another contractor.
  • Tunnel A-B from Chai Wan to Kwun Tong via Shau Key Wan, 4.2 km long, 3.2m diameter, which links other two shafts to Kwun Tong shaft previously excavated by another contractor.
  • For the excavation of both tunnels, two main beam type TBMs were adopted.
  • Both tunnels are located 100 metres beneath the seabed and highly urbanised reclamation areas.

CONSTRUCTION METHODS AND EQUIPMENT
Tunnel excavation
Technical specification of TBM are:
  • boring diameter                            
4,23 m
  • cutters
19" = 482 mm
  • max cutterhead thrust                    
9.340 kN
  • cutterhead speed                        
12.1 rev/min
  • cutterhead drive power                
1.342 kW
Technical specification of TBM are:
  • boring diameter                            
3.2 m
  • cutters
17" = 432 mm
  • max cutterhead thrust                    
5.600 kN
  • cutterhead speed                        
14.6 rev/min
  • cutterhead drive power                
746 kW
Tunnel lining
Temporary rock supports installed according to the NATM
Fibre reinforced concrete pipe to be built inside the tunnels: two parallel 1.35 m. diameter pipes inside the 4.23 m. diameter tunnel and single variable from 1.20 to 1.35 m. diameter pipe inside the 3.2 diameter tunnel.

GEOLOGY
Volcanic Tuffs and Granites with UCS ranging from 80 to 350 MPa

 
 